historie

Quality by tradition


1969 Company foundation under the name of Heinz Bissinger Behälter Stahl und Heizungsbau
Handrail construction
Bridges
Residential building
Crane rails
Steel constructions
Chutes and bunkers for gravel industry
1971 Building of the Zaberfeld works
as from 1972 Change of the portfolio
Sand and gravel loading facilities
Lorry loading silo plant with conveyor
Walkway across the silos with view of the surroundingsg
Ready plaster plants all over the world
Dust extraction for concrete mixing plants for conveyors and belt feeders
Loading nozzle (lorry loading)
Silo drainage pipes
1976 - 1977 Development - export silo
Development of the first type of filter
1980 – 1990 Concrete mixing plants - serial production of containers for the building industry
1990 – 2000 Extension of the portfolio into the field of environmental engineering and the secondary fuel
2005 Company handover and name change to Bissinger Behälter- und Stahlbau GmbH
2014 Certified in conformity with German standard DIN EN 1090
2015 Ten-year company jubilee under the management of Thomas Neher as managing director

 

Member of the DVS Society

DVS Verband RGB

 

facebook   google plus   twitter cq   xing bq

Cookies